03.06.2016
In coorporation with the Main contractor OTV, the company CMC Group took care of supplying and installing the electrical and air conditioning system. At the same time, the company installed the hydromechanical equipment in the system for mechanical pre-treatment of wastewater; a part of the equipment for the treatment of sludge; as well as supplied and installed all the necessary pipe connections.